On November 13-14, the 2640/550 board coating production line of RASHA CASPIAN in Iran was successfully completed, loaded and shipped on schedule. The following picture shows that the workers in the final assembly workshop are doing the final debugging and closing work for the five sets of coating heads before packaging:
Due to the large specifications and complete supporting facilities of this production line, the whole shipment workload is very heavy. In the early stage, we have successively sent four batches, and this is the last batch, with a total of 13 vehicles. The workers in the final assembly workshop worked overtime and worked hard for more than a month, and all departments cooperated closely to ensure the test quality and test results before delivery, which laid a solid foundation for the smooth installation in the client's paper factory.
In recent years, SLMC has deeply cultivated the coating field, and actively integrated into the national "One Belt And One Road" grand strategy, and orders in the overseas market have gradually increased. In order to fulfill the contract commitment on schedule and with high quality, in the face of the pressure of production and manufacturing, the company optimized the resource mix, established the linkage mechanism of human, financial and material, ensured that each element gave full play to the best efficiency, and practically turned the export project which representing the top level of China’s manufacturing ability into the image project. Up to now, we has successfully provided foreign users with nearly 60 sets of coating and finishing equipment, our leading coating and finishing technology, excellent product quality, timely delivery of the performance of the contract and high-quality SLMC brand image have been highly recognized by users both at home and abroad.